Skip to content

Article

Switching chip foundries: will component licences follow?

Before moving a chip to another foundry, verify the core, tool and deliverable rights and tie funding to consents and qualification.

When a foundry raises prices or delivery times slip, a board may approve a second supplier to reduce concentration risk. In this hypothetical, a Saudi design company owns the overall design of an industrial chip, but uses a licensed core, a library tied to a manufacturing process and services from its current foundry. Quotes from the alternative foundry look attractive, yet assume that the company can reuse each component and associated material. The board needs to approve a phased project tied to rights clearance and qualification. Funding the first production lot before those checks could commit the budget to a route that cannot support a commercial launch.

What do we actually own in the chip we intend to move?

Start with a version-level inventory. For each asset, record its source, contracting entity and rights holder, and whether the documents grant ownership, a licence or restricted tool access. Include in-house designs, supplier cores, libraries, process design kits, test files and data required by the packaging provider. Link each asset to a document that identifies its version, process and site where restricted. The board paper should give each component a potential replacement and estimated qualification period. Where no agreement or signed amendment can be tied to a critical component, log it as a condition to clear before any funding commitment.

Does a layout design certificate cover the whole transfer?

Article 51 of the Saudi law governing patents, integrated circuit layout designs, plant varieties and industrial designs addresses exploitation of protected layout designs in the Kingdom, including reproducing the design or an original part and certain import, sale and distribution activities. Article 52 limits the rights, including as regards an identical original design independently developed by another party. The company’s certificate covers the design it identifies. Assess it separately from third-party patents, rights in documents and contractual restrictions on sharing files or tools. If manufacturing or testing will occur abroad, examine the law where each act takes place, the import route and the supplier agreements for the countries involved.

Does the core licence permit appointing a second foundry?

Examine how the licence defines approved foundries, sites, process nodes, fields of use and authorised entities. It may permit using a core in a particular product while requiring written approval or additional fees for a move to another process. It may allow a contractor to work under the licensee’s instructions while treating independent rights and sublicences separately. Articles 21 and 23 address contractual licensing and certain restrictions for protection documents covered by the statute, including limits on licensing to third parties. Seek approval that identifies the actual entities and activities. Show how access will be granted and withdrawn to make the request easier to assess.

Who is responsible for files the first foundry cannot hand over?

Ask for a schedule distinguishing customer materials, deliverables whose rights were acquired, and foundry or third-party materials. For every transferable item, identify compatible tools, the correct version and evidence of completeness. For excluded items, request an explanation of the dependency and options for securing a separate permission or lawfully recreating the outputs. Budget for verification with the new supplier and identify who can approve acceptance. The schedule lets the business tie transition payments to verifiable delivery and gives procurement a way to quantify the customer service impact if the handover slips.

When should we amend the licence or replace the component?

Compare expanding the existing licence, buying time-limited transition consent and replacing the component or redesigning the part tied to the first foundry. Combine permission fees with qualification costs, sample production, time to customer approval and post-launch support obligations. Time-limited permission may suit a company that needs temporary supply cover while developing a replacement. A permanent amendment may suit a company that plans to use two foundries across several generations. Use continued supply under the current model as the baseline, calculate each option over the same period and assess how one delayed consent might affect the whole programme.

Test a scenario where the new foundry is ready but the core supplier’s consent is delayed. It may pay to qualify components outside the approval while stopping before sharing restricted files. Determine which fees remain payable if the project stops and whether the foundry will reallocate the manufacturing slot. Where the sunk cost exceeds the value of starting early, delaying the order has a measurable rationale.

How can the company qualify the new foundry while protecting information?

Split qualification according to each party’s information needs. Initial compatibility testing can use authorised data. Expand access once permissions are in place and recipients and purposes are identified. Record who approved each transfer, what was shared and when, and restrict access for testing and packaging providers where appropriate. A confidentiality commitment does not expand a licence. If a test at the second foundry requires restricted material, compare a narrow approval with the possibility of using independent test data. Agree on qualification criteria, such as customer acceptance of sample results, and how to address failure without leaving permanent access in place.

What should investors require before funding production orders?

Tie the release of funds or purchase approval to three deliverables. The first is a rights matrix signed by counsel, identifying permissions and exceptions. The second is a technical report on completed and outstanding tests and responsibility for requalification. The third is a supply plan covering bridge inventory, the incumbent foundry’s obligations and the fallback point. Assign a decision owner, deadline and spending cap for each. Where a contractual delivery date will precede qualification, assess whether to amend the customer commitment before scaling. Check that rights to sell remaining inventory and provide warranty support survive the change of supplier.

If the chip goes into an industrial customer’s device, identify customers that require notice of a foundry change or sample reapproval. Rank them by revenue at risk and likely verification time. Base the first order on demand covered by existing approvals and scale once the other tests are complete. A foundry’s consent is one milestone in readiness to sell.

Can the first contract build in portability?

Negotiate an option to add a foundry on objective terms, pricing for approvals and a deadline for responding to requests. Include a list of portable deliverables, access to the versions needed to requalify, and a confidential channel for transferring permitted materials to another foundry. Negotiate production support during the transition and limits on the continued use of materials after termination. Whenever a licensed component changes versions, revisit the rights matrix before bringing it into production. Management can then assess supplier dependency against actual commitments before a crisis triggers a hurried move.

For more information, contact us

More insights

Articles and legal updates.

Contact

Speak to AZ&P about the decisions that shape ownership, growth and risk.

Talk to us about your legal matter.

Message us on WhatsApp, call us or book a time. We reply with the next step and a fee quote.