Sharing Industrial Prototypes with a Manufacturer in Saudi Arabia

When should a company release its prototype and design files to a manufacturer? Practical guidance on disclosure before filing, confidentiality, improvements and tooling.

A Saudi industrial company is moving a new product from the lab to its first commercial batch. In this hypothetical, a prospective manufacturer asks for the complete design files, material details and a sample it can dismantle before issuing a firm quote. The company needs a quote within a week to close financing for production tooling. Management must decide what information is sufficient for pricing and assessing the factory’s capabilities, and what warrants a filing or a contractual arrangement before disclosure. The answer depends on how easily the factory can be replaced, what the sample reveals and which steps drive the launch timetable.

What should the company classify before seeking manufacturing quotes?

Distinguish dimensions needed for initial pricing, drawings required for the pilot and know-how that drives commercial value, such as a processing sequence or closely defined acceptance limits. Ask the product engineer what can be separated without compromising safe manufacture or accurate pricing. A quote may rely on dimensions, process type and output rates without requiring native design files. A capability test may need selected drawings and measurement criteria reviewed by a named team. Keep a simple record of versions, files, recipients, purposes and access end dates. Review it when a revision is released. A file that did not reveal the solution alone may do so when paired with a later revision or a completed sample.

When is it better to file before sharing the prototype?

In Saudi Arabia, Article 44 of the law issued by Royal Decree M/27 addresses invention novelty and public disclosure. Article 59 addresses industrial design novelty. Protection for a technical solution differs from protection for a product’s appearance. If the sample reveals both, assess whether the specification and design representations are ready for filing and whether intended production and sales markets apply different disclosure rules. Limited confidential evaluation may suit some circumstances, depending on who can access the information and on what terms. Assess the facts and exceptions before assuming that a private disclosure is safe or that any disclosure necessarily defeats protection. Cabinet approval of the standalone Designs Law and Patents and Utility Models Law was announced on 20 October 2026. As of 24 November 2026, publication or commencement of the final texts could not be confirmed, so the analysis draws on existing verified provisions.

How can a company document reasonable measures to preserve secrecy?

Article 1 of the Regulations for the Protection of Confidential Commercial Information, issued by Decision 3218 on 4 May 2005, ties protection to secrecy, commercial value from secrecy and reasonable measures to preserve it. In manufacturing, define the permitted purpose, confine access to people who need it and control circulation of samples and drawings. Find out where the files will actually go, from estimating through operators and testing specialists to independent subcontractors. Identify the receiving organisations and their obligations before release. Grant limited-duration access or supply a sample for onsite testing with photography or dismantling subject to agreement. If dismantling is essential, specify its extent, how it is recorded and what happens to parts afterwards. The proposed Trade Secrets Law on the public consultation platform is treated here as a draft based on the status that could be verified.

Who owns improvements proposed by the manufacturer?

The issue often starts with a change that reduces scrap, alters a fastening method or enables production on available machinery. Record who proposed it, whether it relies on the customer’s design or the factory’s existing technology, and who documented testing. Set a written process before development starts. Identify rights that can be assigned, rights requiring licences and what the manufacturer keeps in its tools and general know-how. Verify what each party can grant, including contributions from a tool shop or subcontractor. If an improvement is necessary for approval, agree who can use it with a replacement factory, who keeps the measurement files and whether development is paid separately or included in the unit price.

Does paying for tooling make it portable?

Specify ownership, location, maintenance and the condition and charges that apply on transfer. Review rights to the tooling drawings, operating programme and calibration files needed to reproduce the item. The customer can own an asset and still be unable to run it on another line without a specification or file outside the purchase order. Mark the tool and record it in the asset register. Provide for inspection and release when the relationship ends. Identify standard tooling parts owned by the manufacturer before assuming the assembly can move in full. Test actual portability on a trial batch, or cost a replacement tool and its expected downtime before approving the investment.

For staged financing, match releases of funds to verifiable evidence, such as images of the numbered asset, test records and copies of agreed files. If the manufacturer cannot agree to release the tool in all circumstances, document an alternative and its cost upfront, and revisit the assumptions when production volumes increase materially.

How should the pilot batch and resulting inventory be controlled?

Distinguish permission to make evaluation units from permission to begin commercial manufacture. State the authorised quantity and acceptance criteria. Decide who holds rejected units and scrap and what happens to test pieces once evaluation ends. If a subcontractor is required for coating or measurement, define what it receives and returns. A limited task may need only part of the overall design. Require a record linking each batch to a version, an approval date and the materials actually supplied. Before increasing volumes, check the move from pilot to approved design. Confirm that material and process changes were approved before they affect warranties or the cost of rejected units.

What should the board review before authorising release?

In the hypothetical, management can request an estimate from a reduced specification, proceed with controlled evaluation after reviewing confidentiality, or withhold the full file until a suitable filing is made. Estimate the time and cost of each route. Decide when to approve a pilot and how late the company can switch factories without missing launch. Define escalation triggers if the factory requests an unnecessary file or appoints a subcontractor before approval, and preserve evidence and consult the agreement to decide how to respond. Approve the handover schedule, access rights and return or deletion of materials at the end of their permitted use, considering retention needed for legal compliance or evidence. The board can then see the production plan and its exposure before committing to release.

For more information, contact us

More insights

Articles and legal updates.

Contact

Speak to AZ&P about the decisions that shape ownership, growth and risk.

Talk to us about your legal matter.

Message us on WhatsApp, call us or book a time. We reply with the next step and a fee quote.